Penang International Airport Expansion 2026: 12 Million Passengers by 2028

By Chan Wei Chao (REN 39846), Team Leader, Bricksmen Team · IQI Realty Sdn. Bhd. · Updated 24 October 2026

The expansion of Penang International Airport (PIA) will almost double its capacity, from 6.5 million to 12 million passengers a year. The airport is already handling more people than it was built for: 8.31 million passengers in 2025. Malaysia Airports (MAHB) is targeting completion in June 2028, and the first work package is already finished.

Here is what is being built, how far the works have progressed, and what a bigger airport means for Penang and for homes in the Bayan Lepas area.

PIA expansion at a glance

ItemDetails
DeveloperMalaysia Airports Holdings Berhad (MAHB)
CostAbout RM1.55 billion (MAHB, July 2025)
Passenger capacity6.5 million → 12 million a year
Aircraft parking stands16 → 28 (six new contact stands linked to the terminal and six remote stands)
Target completionJune 2028
Passengers in 20258.31 million, up 11.25% from 7.47 million in 2024
Passengers in first half of 2026About 4 million (2.2 million international, 1.8 million domestic)
Network27 airlines serving 22 destinations (September 2026)

Progress: where the works stand

Work packageScopeStatus
WP01Support buildings, utility relocation, infrastructure and a remote digital virtual control tower100% complete; Certificate of Completion and Compliance received 1 July 2026
WP02Airside works: apron expansion, taxilanes, drainage and airfield lightingAbout 70% complete (July 2026)
WP03Main terminal building expansion and associated worksDesign completed; procurement started 25 June 2026

State Infrastructure, Transport and Digital Committee chairman Zairil Khir Johari said in July 2026 that the project is “progressing according to schedule,” with works continuing until 2028. More immigration autogates are also being added, with 12 each for departures and arrivals planned by the end of 2026.

Why the expansion matters

  • The airport is over capacity. At 8.31 million passengers in 2025, PIA is already well above its 6.5 million design capacity, which explains the queues at peak times.
  • More routes. Twelve extra aircraft stands give airlines room to add flights and new destinations, helping tourism, medical tourism and business travel.
  • Industry needs it. Penang exports about 45% of Malaysia’s goods, and the E&E sector relies on air freight and on executives and engineers flying in and out.
  • Recognition. In October 2026, PIA was named CAPA Asia Small and Medium Airport of the Year.

Getting to the airport: the LRT

The Mutiara Line LRT will have a Penang International Airport station (S03), one of the two stations with the fastest construction progress, linking the airport to Bayan Lepas, Bayan Baru, Gelugor and George Town. The line is scheduled to open in December 2031. See our Penang LRT route map.

What it means for property near the airport

Homes in Bayan Lepas, Bayan Baru and Batu Maung are closest to the airport and to the Bayan Lepas industrial zone, the island’s biggest employment area. A bigger airport, the LRT station and Silicon Island next door all add to the area’s long-term appeal for own-stay buyers and for rental to airline, industrial and medical-tourism workers.

New launches near Penang airport

ProjectAreaIndicative priceCompletion
Maldives ResidenceBayan LepasRM498,000–RM550,0002027
Senze @ PICCBayan BaruPrice on request2027
Queens Residences Q3Bayan LepasRM958,130–RM1,988,6402027
Valencia ResidenceBayan LepasRM1,391,300–RM1,553,600Completed
Desa Seri Aman (landed)Batu MaungRM1,600,000–RM2,010,000Completed
Casa Rica (Phase 2) (landed)Sungai AraFrom RM2,377,500Completed

Browse every project on our Bayan Lepas and Bayan Baru pages.

Frequently asked questions

When will the Penang airport expansion be completed?

Malaysia Airports is targeting June 2028. The first work package was completed in July 2026, airside works were about 70% done, and procurement for the main terminal expansion started in June 2026.

How many passengers will Penang airport handle after the expansion?

Up to 12 million passengers a year, up from the current design capacity of 6.5 million. The airport handled 8.31 million passengers in 2025.

How much does the Penang airport expansion cost?

About RM1.55 billion, according to Malaysia Airports in July 2025.

Will the LRT go to Penang airport?

Yes. The Mutiara Line has a Penang International Airport station (S03) and is scheduled to open in December 2031.

Looking for a home near the airport or Bayan Lepas?

I can send the latest price lists for projects in Bayan Lepas, Bayan Baru and Batu Maung. WhatsApp or call +60 10-313 9113.

Sources

This article is general information based on Malaysia Airports and state government statements and published reports as of 24 October 2026. Timelines may change. It is not investment advice; project prices are indicative and depend on availability.