By Chan Wei Chao (REN 39846), Team Leader, Bricksmen Team · IQI Realty Sdn. Bhd. · Updated 23 November 2026
The Penang Bridge will be reduced to one lane in each direction at night from 24 to 26 November 2026, with stop-and-go traffic control. Highway concessionaire PLUS announced the closures for installing an LED advertising board gantry, paultan.org and Penang Today reported.
The key facts
| Item | Details |
|---|---|
| Location | KM0.7, Penang Bridge, both directions |
| Dates | 24, 25 and 26 November 2026 |
| Hours | 11pm to 5am the next morning |
| Lanes | Middle and right lanes closed; one lane open |
| Traffic control | Stop-and-go |
| Reason | Lifting a gantry for a new LED advertising board |
| Announced by | PLUS |
On the same three nights, lanes on the Tun Dr Lim Chong Eu Expressway towards Bayan Lepas near The Light will also close from 10pm to 5am. See our report on the LCE lane closures.
What it means for commuters
- Late-night drivers, allow extra time. Expect queues at the bridge after 11pm.
- Consider the second bridge. Drivers heading to Batu Kawan or Bayan Lepas may prefer the Sultan Abdul Halim Muadzam Shah Bridge.
- Short works, no full closure. One lane stays open each night.
Projects to consider
Homes on both ends of the Penang Bridge: Gelugor on the island and Juru on the mainland.
| Project | Location | Type | Price | Completion |
|---|---|---|---|---|
| The Lighthauz | Gelugor, beside the Penang Bridge | Serviced suite, 732–1,001 sq ft, freehold | From RM864,500 | September 2030 |
| Glisten Hill | Juru | Condominium, 1,305–1,312 sq ft, freehold | RM553,190–RM599,720 | Completed |
| 1 City Height | Juru, Bukit Minyak | Condominium, 950–1,050 sq ft, freehold | RM442,000–RM533,000 | Q2 2027 |
Prices are developer selling prices and change with availability. WhatsApp us for the latest price list and units still available.
Frequently asked questions
When is the Penang Bridge lane closure?
From 11pm to 5am on 24, 25 and 26 November 2026.
Will the bridge close completely?
No. One lane stays open in each direction, with stop-and-go control.
Why are lanes closing?
To lift a gantry for a new LED advertising board.
Looking at homes near the Penang Bridge?
WhatsApp or call +60 10-313 9113.
Sources
- paultan.org: Penang Bridge nightly lane closure, stop and go traffic control for LED ad board gantry works
- Penang Today: Penang Bridge down to one lane nightly on 24–26 November
This article is general information based on published reports as of 23 November 2026. It is not investment advice.
